image description

Our Blog

sand-bags_vs_foam-bridges

Don’t Drain Your Pipeline Profits

This overview of a pipeline installation shows the cost difference when repairing one water tile break with 200 sandbags vs. a Mad Dog Foam Bridge. A typical project can have up to 18 tile repairs per mile.

sandbags

Share this Post:

Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *